Epic - The Berm
MAMBO KINGS
6/18/03

The Berm was one of the major components of the Trail Work. To get down the slope a curving path was planned so the berm was essential. After using the Bobcat to cut the path, old tires were placed on the outside of the curve. We got them for free which of course is the best price you can get. Fill the tires completely with soil so that they can't flex. We also added rocks in the centre of them to make them even more stable.

The final touch on The Berm was to harden the surface. Mansfield is mostly sandy loam, which doesn't bind very well. The Trail Care Crew's solution was to mix kitty litter with the sand and then wet it down using a fire fighters pump pack. It hardened up nicely and most importantly it is way fun to ride.

 

page 1 of 2 Next

P1010212 P1010213 P1010236 P1010237
P1010212.jpg P1010213.jpg P1010236.jpg P1010237.jpg
P1010239 P1010240 P1010256 P1010257
P1010239.jpg P1010240.jpg P1010256.jpg P1010257.jpg
P1010259 P1010260 P1010261 P1010262
P1010259.jpg P1010260.jpg P1010261.jpg P1010262.jpg